The Army’s counter-drone problem isn’t technical—it’s procedural. A recent NDIA Emerging Technologies Institute survey of C-UAS stakeholders confirms what most of us already suspected: the service has the urgency, the technology, and the industrial interest, but it can’t convert any of that into fielded capability before the threat evolves again. The gap isn’t innovation; it’s the acquisition system’s inability to get out of its own way.
What struck me most in the findings was how clearly industry articulated the friction points—unclear requirements, fragmented demand signals, weak feedback loops, uncertain transition funding, and unpredictable production commitments. One respondent put it plainly: “Don’t suggest tech is needed if there is not real money at the end of the tunnel.” That’s not cynicism. That’s a rational response to a system that treats demonstrations as outcomes rather than steps toward programs of record. For cleared senior leaders running business development or capture in this space, that uncertainty makes it nearly impossible to justify internal investment or defend headcount.
The article makes a strong case that speed and rigor don’t have to be opposing forces—rigor just needs to happen earlier, continuously, and closer to users. Stable problem statements, open architectures, soldier feedback, standing test opportunities, and honest communication about what will actually be bought would go a long way. The Army has the authorities and the operational need. What it lacks is an acquisition model that aligns requirements, funding, testing, and transition with the pace of the threat. Until that changes, the industrial base—primes and small firms alike—will keep building capabilities the Army says it needs but struggles to field.